New sod has short roots and dries out quickly. The goal for the first few weeks is to keep the sod and the top inch or two of soil underneath moist, without turning the yard into a puddle.
Day one
Start watering as soon as the first sections are down, not after the whole lawn is finished. Soak each area until the soil underneath is wet. Lift a corner to check: the soil should be damp, not just the grass.
The first two weeks
- Water every day, and more than once a day in hot or windy weather. Short cycles soak in better than one long run on clay.
- Pay extra attention to edges, slopes and spots next to driveways and walks, which dry out first.
- Watch areas over shallow rock, where thin soil holds less water and browns sooner.
Weeks three and four
Once the sod resists a gentle tug, the roots are taking hold. Cut back to watering every other day, then a few times a week, giving more water each time so the roots follow it deeper.
Clay soil and summer heat
Much of Middle Tennessee has clay that takes water in slowly. If water starts running off or puddling, stop and let it soak in before running another cycle. In July and August heat, warm-season sod may need water twice a day at first. Tall fescue sod laid in summer needs the most care of all.
After it is established
Switch to deep, infrequent watering. Most established lawns do best with about an inch of water a week, including rain, applied in one or two sessions. Water early in the morning to reduce disease.